Participants must have at least one revenue grade meter and an online reporting system. The online reporting system does not have to be revenue grade, however if it is than a second revenue grade meter is not required. Please note that the utility installed meter does not qualify as a revenue grade meter for this program, the meter must be installed immediately after the inverter and before any load. Also note that most inverter based reporting systems are not revenue grade.